Welcome to trade-ok.com boss

Login in

Inspetion/QC
Product Scope

Electronics & Household Electrical AppliancesLighting EquipmentVehicles & Spare Parts MachineryHardware & ToolBuilding Materials Chemical Products

Textiles & Garments ShoseOffice Supplies,Cases & Baqs,and Recreation ProductsMedicines, Medical Devices and Health ProductsFood & Native produce

Consumer Goods Gifts Home Decorations

Major Inspection Processes

1. Pre-production Inspection

Identify any potential flaws in the raw materials, components or accessories, and verify the problems found immediately.

At the initial stage of production, we will carry out inspection on the raw materials, components and accessories based on the descriptions and sample(s) given by our clients. After the inspection, potential problems may be discovered and suggestions will be given for clients in order to make sure the production will conform to their requirements.

Main inspection points:

The production line and capacity of the factory

The factory facilities: its machinery and equipments

Raw materials, components and accessories

Semi-finished products.

2. Dur-production Inspection

Ensure the product quality be guaranteed and look into the lurking problems which need to be justified before the whole production is finished.

When 20%-30% of the production is completed, we will carry out the sampling inspection according to our clients’ product sample(s) and descriptions. Main inspection points:

Main inspection points:

Production status

Casual inspection among the semi-finished and finished products

Production line and capacity

Packing information and materials

Recommended suggestions for improvement

3. Pre-shipment Inspection

Ascertain the finished products will coincide with the clients’ requirements.

After 100% of the production is finished and packed, and before the delivery, we will carry out the international sampling program like MIL-STD-105E(ISO2859-1).

Main inspection points:

Quantity

Pattern and color

Appearance

Function and safety

4. Container Loading

Make sure the container used is suitable for your product transport, and seal the container after the whole loading is finished in order to lower the risk of the products being altered for other goods.

Main inspection points:

Weather record, time of arrival of the container, the container and vehicle number

Condition of container (inner and outer status), including its breakage, dampness and odour

Quantity and packaging

Seal the container

Supervision of the overall loading process

Seal the container

The seal number and departure time of the container

Trade-ok.com     Reverse Sourcing Event    

Service Line:0086-20-87567277 Copyright © 2001--2012 trade-ok.com.